Current Projects

Lake St.Martin Outlet Channel Access Road

MI 7006 : Construction of a composite excavation, shot rock and crushed rock embankment with a traffic gravel surface and through grade culvert installations on the Lake St.Martin outlet channel access road.  The location of the work is 72.3 km east of Provincial Trunk Highway 6 to 91.8 km north earsterly of PTH 6 for a total construction distance of 19.5 km in Electoral District of Interlake.

Cross Lake Airport

X23173 : This project regrading of ditches on both sides of runway, repair and installation of French Drain at north end of Runway 5, installation of culvert across access road to airport stockpile.

Traffic Safety Improvements PR 392

X051004 : Installation of guardrail and end treatments at two locations on Provincial Road 392.  These locations are approximately 17.5 km north and 30 km north of Provincial Trunk Highway 39 in the vicinity of Grass River and Snow Creek, for a total construction distance of 253 m in Unorganized Territory.

Northcott Drain Rehabilitation

X34090 : Drainage improvements of approximately 1.6 km of Northcott Drain in the vicinity of The Pas in the Rural Municipality of Kelsey.  The work includes rehabilitation and installation of thru-dike culverts.

Sifton Drain Rehabilitation

X33068 : Drainage improvements to approximately 6.7 km of Sifton Drain, in the vicinity of Sifton, in the Rural Municipality of Dauphin.  