Current Projects

BITUMINOUS REHAB & INTERSECTION IMPROVEMENTS PR 392/PTH 39

MI 6934: Construction of intersection improvements at 3 locations on Provincial Road 392 at Berry Bay access, Provincial Road 395 junction, and Lakeshore Drive within the boundary of the Town of Snow Lake.  The work includes bypass lanes, culvert extensions, solid rock excavation, embankment using solid rock, composite, crushed rock, granular base course and bituminous paving.

Culvert Replacements PR 391

MI X05991 :  This project involves replacing culverts in various locations along Provincial Road 391, from Leaf Rapids to Lynn Lake.

Bituminous Reconstruction & Rehabilitation PTH 10 & PR 366

MI 6922:  Reconstruction of Provincial Trunk Highway 10, and rehabilitation of Provincial Road 366, in the Town of Swan River, the Municipality of Swan Valley West and the Municipality of Minitonas-Bowsman. The total construction distance of this project is approximately 4.8km on PTH 10 and 7.8km on PR 366,  proceeding 0.8 km East of the Junction of PR 488 to 1.2km East of the Junction of PTH 10A, East of Swan River.  This project entails the reconstruction of bituminous pavement, granular base course shoulders, and intersection improvements. Reconstruction of exisiting divided highway includes waste excavation, granular fill, granular base course, concrete medians and culvert replacements.  Rehabilitation of PR 366 includes the construction of bituminous pavement overlay and granular base course shoulders.

 

Gravel Road Restoration PR 416

MI X02519:  This project aims to restore Provincial Road 416 to pre-floor conditions.  The work involves the application of crushed rock, and includes spot grade improvements and slope armouring.  The total construction distance spans approximately 2.9 km, North of PR 415, in the Municipality of Armstrong.

Gravel Road Restoration PR 415

MI 6916: To restore Provincial Road 415 to pre-floor conditions the installation of a corrugated steel culvert and application of crushed rock is required.  The work also includes elevation improvements, surface widening, and slope armouring.  The total construction distance of this project is approximately 5.8km, from 7.3km east of PR 518 to PR 416, in the Municipalities of Armstrong and St. Laurent.