Lake St.Martin Outlet Channel Access Road

MI 7006 : Construction of a composite excavation, shot rock and crushed rock embankment with a traffic gravel surface and through grade culvert installations on the Lake St.Martin outlet channel access road.  The location of the work is 72.3 km east of Provincial Trunk Highway 6 to 91.8 km north earsterly of PTH 6 for a total construction distance of 19.5 km in Electoral District of Interlake.

P.O. Box 578, Dauphin, MB  R7N 2V4 Canada
© Strilkiwski Contracting Ltd. | Webdesign by Bankert Marketing Inc.