Current Projects

Lake St.Martin Outlet Channel Access Road

MI 7006 : Construction of a composite excavation, shot rock and crushed rock embankment with a traffic gravel surface and through grade culvert installations on the Lake St.Martin outlet channel access road.  The location of the work is 72.3 km east of Provincial Trunk Highway 6 to 91.8 km north earsterly of PTH 6 for a total construction distance of 19.5 km in Electoral District of Interlake.

Cross Lake Airport

X23173 : This project involves regrading of ditches on both sides of runway, followed by repair and installation of French Drain at north end of Runway 5, and finally installation of a culvert across access road to airport stockpile.

Culvert Replacements PR 395

X051003 : A 1 km section of Provincial Road 395 ungergoes an emergency culvert replacement. This section is from PR 392 to 4 Km west of PR 392 in "Unorganized Territory", just south of the Town of Snow Lake. 

Northcott Drain Rehabilitation - The Pas/RM of Kelsey

 X34090 : Drainage improvements of approximately 1.6 km of Northcott Drain in the vicinity of The Pas in the Rural Municipality of Kelsey.  The work includes rehabilitation and installation of thru-dike culverts.

Bituminous Rehabilitation PTH 5 - Gilbert Plains

MI 6931 - Construction of bituminous pavement, granular base course shoulders and replacement of culverts on Provincial Trunk Highway 5 in the Municipality of Gilbert Plains.  Total construction distance of the project is 12.98 km. 

P.O. Box 578, Dauphin, MB  R7N 2V4 Canada
© Strilkiwski Contracting Ltd. | Webdesign by Bankert Marketing Inc.