Current Projects

Culvert Replacements PR 395

X051003 : Culvert replacements on Provincial Road 395, from PR 392 to 4 Km west of PR 392 in Unorganized Territory.

Mossy River Dam Boom & Anchors

X33067 : Construction and installation of cast-in-place concrete anchors at Mossy River Dam within the Rural Municipality of Dauphin, apprx. 57 km north of the city of Dauphin.  This work also includes on-site installation of the floating navigational boom, individual buoys and all accessories and appurtenances, as well as supply and installation of stone rip-rap, boulders and chainlink fencing. 

Bituminous Rehabilitation PTH 5

MI 6931 - Construction of bituminous pavement, granular base course shoulders and replacement of culverts on Provincial Trunk Highway 5 in the Municipality of Gilbert Plains.  Total construction distance of this portion of the project is 12.98 km. 

Culvert Installation PTH 20 Winnipegosis

X04501 : Removal of a treated timber box culvert and installaton of pre-cast concrete culverts including frost taper construction and bituminous patching on Provincial Trunk Highway 20, apprx 15.7 km North of PR 364, in the Rural Municipality of Mossey River (Bridge No. 3054)

Bituminous Rehab & Intersection Improvements PR 392/PTH 39

MI 6934: Construction of intersection improvements at 3 locations on Provincial Road 392 at Berry Bay access, Provincial Road 395 junction, and Lakeshore Drive within the boundary of the Town of Snow Lake.  The work includes bypass lanes, culvert extensions, solid rock excavation, embankment using solid rock, composite, crushed rock, granular base course and bituminous paving.

P.O. Box 578, Dauphin, MB  R7N 2V4 Canada
© Strilkiwski Contracting Ltd. | Webdesign by Bankert Marketing Inc.